Master Plan for Płock
PL
Table of Contents Master Plan (PDF)

INTEGRATED TRANSPORT MASTER PLAN FOR PŁOCK Mitigating Critical Systemic Risks
and Building Logistics Resilience
in the Feedstock Heart of Poland

EXECUTIVE SUMMARY Eliminating Single Point of Failure (SPoF) Risks
in the Feedstock Heart of Poland

The subject of this study is to demonstrate the urgent need for a comprehensive reconfiguration of the transport infrastructure of Płock – an agglomeration that constitutes the absolute foundation and geostrategic keystone of the fuel, energy, and defence security of the Republic of Poland. The current transport network poses significant risks to the continuity of these functions due to the absence of grade-separated connections between critical infrastructure and the expressway network, as well as the inadequacy of the railway network for bulk cargo transport and passenger services.

The Płock agglomeration concentrates the country's key critical infrastructure (ORLEN S.A. and PERN S.A.), while remaining a transport island without adequate road and rail connections. In the face of hybrid threats, the current layout generates a critical single point of failure (SPoF) risk.

Achieving full logistical and economic resilience of this key industrial hub requires the parallel implementation of an integrated package of infrastructural solutions, based on the pillars listed below.

INTEGRATED INVESTMENT PACKAGE (MASTER PLAN FOR PŁOCK):

The investments presented in the master plan aim to overcome the region's transport peripherality and fully integrate Płock into the national logistics system (the entire network of connections is shown in Figure 1).

The key element in the road component is the high-priority section: Koło junction (A2) – Lubień Kujawski junction vicinity (A1) – Gostynin – Płock – Glinojeck junction (S7). The proposed route is an integral part of a broader, macro-regional express road corridor along the Kalisz – Zambrów axis (Figure 2), the implementation of which will provide critical topological network redundancy and significantly increase the transport resilience of central Poland. On a regional scale, this corridor will serve as an external, strategic bypass for the Płock refining hub, mitigating risks associated with the concentration of hazardous materials transport.

In the railway component, the master plan emphasises the construction of a second track and the full electrification of Line 33 on the Kutno – Trzepowo section, as a key link in the North–South Railway Strategic Axis (Zgierz – Kutno – Płock – Grudziądz – Laskowice Pomorskie), illustrated in Figure 3. In order to fully exploit the potential of this corridor, it is essential to take action at the governmental level to include the further modernisation of the entire Line 33 north of the Trzepowo station (construction of a second track and electrification) and Line 208 on the Brodnica – Laskowice Pomorskie section in national investment plans. This action should become an element of the complementary plans of the national infrastructure manager (PKP Polskie Linie Kolejowe S.A.).

The condition for achieving a synergy effect is the systemic and continuous adaptation of the technical parameters of the public transport network to the dynamically changing feedstock and technological needs generated by strategic industrial plants in Płock.

PHASING STRATEGY (2027–2037):

The timely implementation of the indicated implementation phases is the foundation for achieving multi-level benefits, crucial both for the development of the Płock region and for the stability of the entire country.

STRATEGIC BENEFITS FOR THE COUNTRY:

The estimated CapEx is PLN 17.4–21.8 billion for the years 2027–2037. Integrated investments in the Płock region meet the criteria for dual-use infrastructure, qualifying for immediate co-financing from the EU's CEF Transport – Military Mobility programme and national defence funds.

The implementation of the integrated master plan for Płock is the key to building uncompromising resilience and full logistical redundancy in the region of the country's key strategic plants. The new axis of the S60 Expressway will become the central element of this system, permanently breaking the existing transport isolation of the region and guaranteeing secure freight distribution flows. The scale and interdisciplinary nature of the project require the urgent establishment of a dedicated inter-ministerial team under the Council of Ministers, capable of coordinating the actions of government bodies, state-owned enterprises, and local governments. The implementation of these priority investments will eliminate the critical risk of paralysis of critical infrastructure, forming the foundation for the long-term energy, feedstock, and defence security of the Republic of Poland.


TABLE OF CONTENTS
1. INTRODUCTION AND THE ESSENCE OF STRATEGIC ISSUES
2. SECURITY LANDSCAPE: STRATEGIC FUNCTION OF PŁOCK AND RISK IDENTIFICATION
3. ROAD INFRASTRUCTURE: EVACUATION SYSTEMS AND THE ROLE OF THE S60 EXPRESSWAY
4. RAILWAY INFRASTRUCTURE: FREIGHT BYPASS AND PASSENGER TRUNK HUB
5. TRANSVERSAL DEFENCE CORRIDOR S12/S60: NATIONAL LOGISTICAL INTEGRATION
6. INVESTMENT PHASING STRATEGY AND IMPLEMENTATION SCHEDULE
7. FRAMEWORK CAPITAL EXPENDITURES (CAPEX) AND STATE BUDGET REVENUES
8. IMPLEMENTATION RISK MATRIX AND MANAGEMENT STRATEGY
9. SYNTHESIS OF CAPACITY AND TRAFFIC FLOWS ACROSS STRATEGIC VISTULA CORRIDORS
SUMMARY
BASELINE MATERIALS AND DATA SOURCES
LIST OF FIGURES

1. INTRODUCTION AND THE ESSENCE
OF STRATEGIC ISSUES

Contemporary geopolitical challenges, escalating hybrid threats, and NATO military mobility requirements necessitate an immediate review of Poland's transport map in the region of its most important refining, petrochemical, and hydrogen hub – Płock. The paramount objective of the state must be to ensure the operational and defensive continuity of the Płock plants, which form the heart of the country's fuel supply. Despite such a fundamental role, years of systemic neglect have led to a situation where the city remains a transport island.

Hitherto isolated central plans – including the expansion of the S10 road, which bypasses the city far to the north, and routine modernisations of national routes to class GP standard[1],[2] – do not eliminate systemic risks. Such a layout completely deprives Płock of the chance to form even a partial orbital ring road. This represents a critical threat in crisis situations, drastically limiting the mobility of emergency services and preventing the efficient evacuation of the population from threatened zones of the agglomeration.

In this situation, a multi-pronged approach is necessary. The structural reconfiguration of the railway network, the expansion of the integrated City Ring Road, and the introduction of the S60 Expressway as one of the main pillars of the national network are interdependent projects (Figure 1). These actions must be implemented through the coordinated cooperation of central ministries (Ministry of National Defence, Ministry of Infrastructure, Ministry of State Assets), local governments, and state-owned enterprises.

The presented document has the character of a framework, community-driven master plan. As a directional framework, it focuses on the strategic essence – the definition of transport corridors, risk mitigation and systemic integration. Secondary detailed analyses have been deliberately omitted, leaving detailed traffic modelling and microscopic construction designs to the competence of the relevant local and government authorities.


2. SECURITY LANDSCAPE: STRATEGIC FUNCTION
OF PŁOCK AND RISK IDENTIFICATION

2.1. Extraordinary Concentration of Critical Infrastructure
and Requirement for Technical Flexibility

The Płock agglomeration has a unique concentration in Europe of upper-tier and lower-tier establishments with a high risk of major industrial accidents (in accordance with the SEVESO III Directive)[3],[4]. The ORLEN production complex and the PERN feedstock storage and logistics base are responsible for the continuity of fuel supplies to the economy and the Polish Armed Forces. This centralised critical infrastructure is currently in a logistical deadlock – the transport of refined products and feedstocks relies on conflicting, narrow single-carriageway roads and railway lines cutting through the middle of residential areas.

In this context, treating transport and feedstock infrastructure as static is a fundamental planning error. There is a critical necessity to legally and spatially sanction the principle of continuous, mutual adaptation of public transport corridors and underground pipeline networks. Contemporary engineering allows for the complete elimination of spatial conflicts – where projected roads and tracks closely approach existing pipeline corridors, industrial plants gain the ability to flexibly manage their infrastructure. By utilising advanced trenchless methods (e.g., horizontal directional drilling – HDD), transmission routes can be adaptively and seamlessly relocated in a manner that is completely non-invasive to newly established arteries. The technological coordination of these actions ensures that underground pipelines cease to be a planning barrier, instead becoming an element of an integrated logistics system. The same principle of spatial flexibility applies to overhead extra-high-voltage power lines, which can be seamlessly integrated into new transport corridors through modern underground cabling techniques or by increasing pylon heights.

In summary: maintaining the transport status quo around the Płock industrial hub creates a critical systemic risk, directly undermining the foundations of civil security and the defence capabilities of the Republic of Poland. The rapid technological, feedstock, and production development of the refining and petrochemical complex, combined with an obsolete, inadequate, and conflicting transport network, will inevitably breach public safety thresholds. In the event of a major industrial accident, an act of sabotage, or an escalation of a hybrid conflict, the lack of segregated freight routes and independent strategic corridors will pose a catastrophic threat to human life, public health, and the urban structure of Płock. In the military dimension, maintaining the current state of infrastructure paralyses the mobility of Allied NATO forces and the Polish Army (the military mobility doctrine)[5], cutting off the armed forces from their primary, central source of fuel and energy supply. The cost of inaction in modernisation is no longer merely economic losses, but a real risk of destabilising the country's defence system and losing operational capabilities on the eastern flank.

2.2. Energy Transition and Hydrogen Logistics Hub

The justification for the immediate expansion of the transport system takes on a modern technological dimension. Płock, as the heart of the Mazovian Hydrogen Valley, has already launched hydrogen purification facilities and is becoming the main distribution hub for green hydrogen for heavy transport in Poland[6]. The transport of hydrogen in high-pressure tube-trailers (350–500 bar) presents major challenges in terms of counter-terrorism prevention and emergency response. Conducting such transport via old national roads (DK60/DK62) generates a serious risk of accidents and sabotage. Safe, grade-separated infrastructure isolated from cities is essential for distributing this next-generation fuel to strategic consumers.

2.3. Risk Analysis and the Cost of Inaction

Maintaining the current transport anachronism around critical infrastructure generates three fundamental risks:

General concept of the integrated transport system layout in Płock
Figure 1. General concept of the integrated transport system layout in Płock

2.4. Multimodal Hub in Central Poland

Płock boasts a unique geographical location – it lies in close proximity to the country's central road and rail hub, Port Polska in Baranów, and the Warsaw and Łódź agglomerations. Its location on the Vistula River, part of the E40 international waterway, creates ideal conditions for building a modern, intermodal Multimodal Hub in Płock. This investment will take the form of an advanced river-rail-road port, located directly on the Włocławek Reservoir. The new complex will integrate the mass cargo flows and hydrogen logistics of strategic state-owned enterprises (ORLEN, PERN), including a dedicated storage zone for containerised and break-bulk cargo, though with the deliberate exclusion of long-term liquid fuel storage installations.

This perspective gains critical importance in the context of the government's Port Polska programme, which includes the construction of the central hub in Baranów (located approximately 80 km from Płock) and the significant expansion of Modlin Airport[7]. The proposed Płock Multimodal Hub is envisaged as a strategic, bi-directional consolidation hub. It provides direct passenger-charter integration with Warsaw-Modlin Airport via the planned Line 247, while opening a grade-separated corridor for mass freight flows directed via the Płock Freight Bypass to the south, straight to the main logistics hub in Baranów. Furthermore, the high hydrological parameters of the Włocławek Reservoir guarantee a significantly extended navigation season and stable draught depths for heavy freight, allowing it to pre-emptively absorb logistical pressure and drastically reduce exhaust emissions from road transport in the spirit of modern climate policy.

The Multimodal Hub will be integrated with a new double-track and electrified access route from the Płock Freight Bypass, equipped with a grade-separated, double-track switch junction at the connection to the main line. The project includes the implementation of an ecological marshalling and manoeuvring yard with a track length of 750 metres, featuring a layout of 8 station tracks fully electrified via an automated retractable catenary system, supplemented by a dedicated, electrified 4-track manoeuvring bundle for reversing train sets. All loading tracks are served by automated, electric RMG gantry cranes. The green infrastructure includes a cargo pier adapted to class IV waterway parameters, featuring a complex of three railway tracks embedded in a paved surface, also covered by the retractable catenary system, and an independent road pier with enhanced structural load capacity, dedicated to heavy road transport, oversized vehicles, and out-of-gauge cargo, including process equipment and components for the ORLEN production complex, as well as dangerous goods (classified in accordance with the ADR and RID agreements).

The projected hub will ultimately replace and expand the functionality of the existing temporary transshipment infrastructure (including the Petrochemical Wharf), transforming a temporary offloading point for large-scale apparatus into a permanent, integrated transport hub of national and international significance, meeting class IV waterway requirements (Figure 1).

2.5. Geopolitical Risk Asymmetry and the Need for Multi-Area
Emergency Support

The Płock agglomeration is characterised by a unique structural specificity in Europe. In contrast to Western European countries, where refining and transmission infrastructure is highly decentralised and geographically dispersed, Poland's energy security system – shaped in a bygone geopolitical era – exhibits an extremely high percentage dependence on a single industrial centre. The concentration of the dominant volume of national fuel production in the Płock refinery, combined with its function as an international hub for the PERN pipeline networks, creates a phenomenon of critical risk asymmetry.

In the face of this defined threat structure, a key element of the state's defensive and preventive strategy must be to ensure the maximum capacity of transport corridors and a radical reduction in travel time to Płock for external emergency forces. The scale of a potential incident involving a major industrial accident, an act of sabotage, or a hybrid attack in the region of such a massive production complex by definition exceeds the autonomous response capabilities of the region. Emergency, firefighting, response, and preventive operations will require the immediate, mass deployment of the assets and forces of the National Firefighting and Rescue System (KSRG) as well as dedicated components of the Armed Forces of the Republic of Poland (including chemical defence troops).

Consequently, the current collapse of road and rail infrastructure around Płock ceases to be a local problem. It is a critical bottleneck that, under crisis conditions, not only paralyses the central feedstock and energy hub but also directly destabilises the feedstock security of the entire Republic of Poland, the refining industry of parts of Germany, and – fundamentally in the context of contemporary asymmetric threats – the operational and logistical capabilities of the entire eastern flank of NATO.

It is worth emphasising categorically that planned investments in Allied NATO transmission infrastructure (fuel pipeline systems on the eastern flank) will not alleviate these operational risks. Military pipelines, due to their unidirectional supply specificity and assortment constraints, constitute only a component of the logistics system, whose physical origin and production point remains the Płock feedstock and energy hub. Furthermore, under full-scale conflict or asymmetric warfare conditions, underground transmission lines are highly vulnerable to acts of sabotage and cyberattacks on control infrastructure (pumping stations). In accordance with NATO's logistical diversification doctrine[5], if a pipeline is compromised, the burden of immediate military supply must be absorbed by mass road transport (ADR technical corridors) and rail transport (RID train sets). Without the radical expansion of the S60 Expressway and the construction of a second track from the Trzepowo junction, the country's defence system deprives itself of an alternative logistical distribution corridor (a lateral axis), leaving the Alliance's eastern flank without real security in the event of the underground network becoming immobilised.

The planned bridge crossings in the Płock region (Rydzyno and Maszewo) are deliberately designed to meet the highest, extraordinary military load classification MLC 150 in accordance with STANAG 2021[5]. This will not only allow for the secure, parallel, and bi-directional deployment of columns of NATO's heaviest tracked vehicles (simultaneous MLC 70/100 movement on both carriageways), but will also fully secure dual-use logistics for transporting critical oversized and non-standard cargo for the ORLEN refining and petrochemical complex.

2.6. Płock as a Multi-Domain Geostrategic Keystone (Centre of Gravity):
Justification for Crossing Redundancy

Płock cannot be analysed solely through the lens of standard urban or demographic criteria applied to other cities. In geo-economic and military terms, this centre functions as a unique gravitational centre for the fuel and energy security of the Republic and the entire eastern flank of NATO. The accumulation within a single geographical area of the largest refining and petrochemical complex (ORLEN) in the region, key crude oil and petroleum product transmission trunk lines of PERN, and planned hydrogen logistics hubs makes Płock a key critical point in the state's resilience system.

The Vistula River fits into this unique characteristic, playing a multi-dimensional role in the Płock region. On the one hand, it constitutes an integral component of the E40 International Waterway, meaning a natural inland logistics highway with immense commercial potential. On the other hand – in a purely defensive and operational dimension – the river is a formidable hydrographic barrier dividing the same geopolitical space into two distinct banks. This dual nature of the Vistula generates an absolute engineering requirement: connecting both banks of the river in a manner that guarantees the continuity of state functions under extreme crisis conditions.

For this reason, the postulated construction of a network of fully dual-carriageway national and city roads, alongside double-track, electrified railway lines, does not stem from local transport needs, but from the doctrine of strategic redundancy. Single lanes or single-track routes represent an easy target for diversionary, hybrid, or kinetic actions, creating critical bottlenecks (single points of failure). A dual-carriageway (2x2) cross-section on the bridges in Maszewo and Rydzyno, combined with a double-track standard for railway crossings on the Płock Freight Bypass and the new passenger-emergency route, is the only way to physically isolate freight flows, secure civilian evacuation routes, and simultaneously maintain full, uncompromising mobility for NATO forces.

The geostrategic specificity of Płock, resulting from the concentration of fuel and energy critical infrastructure, justifies the development of the Płock agglomeration railway within a closed-loop system (railway ring). The integration of the modernized Line 33 with the new alignment of the CMK North corridor and the planned freight bypass will allow for continuous (orbital) traffic operations. Under large-scale crisis conditions, this layout will transform into an orbital emergency-evacuation corridor, ensuring full directional redundancy, the elimination of reversing points, as well as grade-separated, simultaneous deployment of emergency forces and mass evacuation of the population.

The importance of the Płock industrial hub obliges government administration bodies to completely abandon an archaic, siloed approach to spatial and ministerial planning. All analyses, designs, and their subsequent implementation must be conducted in a fully integrated manner, combining the competencies of the ministries responsible for infrastructure, state assets, and defence. These investments require the provision of full, uninterrupted funding to guarantee the achievement of the projected technical parameters. Their overriding goal is to protect civilian life and health, as well as to guarantee operational continuity for the Armed Forces of the Republic of Poland and Allied troops, for whom the Płock hub constitutes a critical, central logistical rear base.


3. ROAD INFRASTRUCTURE: EVACUATION SYSTEMS
AND THE ROLE OF THE S60 EXPRESSWAY

3.1. Elimination of the Single Point of Failure (SPoF)

The current road network highly centralises traffic at the Łódź Północ (Stryków) junction and on the section of the A2 motorway towards Warsaw. In the coming years, this region will be critically burdened by a skyrocketing growth in transport flows generated by the construction and commissioning of the Port Polska mega-hub in Baranów[7]. The plans currently being pushed to routinely widen existing motorways contradict basic engineering and planning knowledge. International experience clearly proves that increasing the number of lanes on congested routes does not lead to permanent relief, but instead triggers the phenomenon of induced traffic, which ultimately further amplifies transport congestion.

Under crisis conditions, the paralysis of the Stryków junction freezes transport across central Poland. The proposed S60 route (Kalisz – Płock – Zambrów) serves as a key remedial element in this system (Figure 2). It creates a geometric alternative and a powerful, independent strategic corridor that diverts international and airport transit away from the Warsaw – Łódź axis before it reaches the congested centre, effectively dispersing operational risk.

The implementation of the Łódź Południe junction and the S12 and S8 routes on the southern outskirts of Łódź – while fully justified for serving other macro-regions – does not resolve the structural problems of central Poland in relation to northern Mazovia, as these investments in many dimensions still operate within the highly congested Łódź – Warsaw and Silesia – Warsaw routes. In the face of the launch of the Port Polska mega-hub in Baranów, this will lead to a catastrophic accumulation of transport gridlocks on existing access routes. Only the S60 Express Road, as a completely independent, northern horizontal corridor, allows for the physical diversion of mass transit outside this critical area, guaranteeing real dispersion of strategic and defence risk for the state and relieving the central network before it reaches critical points.

The priority section of the expressway postulated for Płock, running along the route: Koło junction (A2) – Lubień Kujawski junction vicinity (A1) – Gostynin – Płock – Glinojeck junction (S7), constitutes an integral component of the proposed macro-regional transport corridor along the Kalisz – Płock – Zambrów axis (in accordance with the alignment illustrated in Figure 2). Completely overcoming the transport peripherality of the Płock region and structurally increasing the network resilience of central Poland is strictly dependent on the nationwide continuity of this route. It is indicated that without the implementation of the remaining sections of this route (Kalisz – Koło and Glinojeck – Zambrów), the Płock section will lose its intended transit and transversal character, generating a risk of local traffic congestion. At the same time, it must be reserved that the preparation and implementation of the sections located outside the functional area of the city of Płock fall within the exclusive competence of the government administration bodies and the General Directorate for National Roads and Motorways (GDDKiA)[1],[2], and this study defines them as a critical and indispensable external condition.

3.2. Connection via 2x2 Roads with the A1 and A2 Motorways
and the Strategic Role of the Glinojeck Junction

Płock currently remains one of the largest and most important industrial centres in Central Europe that is completely cut off from the expressway network (motorways and expressways). This situation generates massive logistical and environmental costs, forcing the transit of thousands of heavy transport rigs and tankers carrying dangerous substances (ADR) along conflicting, single-carriageway national and regional roads (including DK60 and DK62).

The construction of the S60 Expressway on the Koło junction (A2) – Lubień Kujawski junction vicinity (A1) – Gostynin – Płock – Glinojeck junction (S7) section in a dual carriageway (2x2) standard, along with a new dual carriageway (2x2) bridge over the Vistula at the height of Rydzyno near Płock, represents a key element in eliminating this structural anomaly. The implementation of this corridor provides a threefold logistical-defence synergy:

From the perspective of transport engineering and crisis management, this section is not merely an investment of a local or regional nature. It constitutes a crucial link connecting the motorway network of western Poland with the key S7 express corridor, creating a new, safe, and highly efficient transversal transport axis for the country.

The logistical structure of the Płock agglomeration, in terms of security and transport, must rely on four independent, mutually reinforcing road systems:

Proposed S60 Express Road corridor
Figure 2. Proposed S60 Express Road corridor

3.3. Mitigation of Risks Associated with the Proximity of the Transport
Corridor and Critical Infrastructure

Right-bank, industrial Płock remains isolated from the left bank of the Vistula River, which, in the context of current geopolitical threats, necessitates the construction of new crossings with reinforced structures (in accordance with dual-use infrastructure standards) directly in this area, rather than several dozen kilometers away. Government planners raise the objection that bringing the expressway close to Płock creates a so-called “cumulative target” (the refinery and a key road hub) for a potential enemy attack.

However, this objection is based on anachronistic and flawed planning assumptions, standing in direct contradiction to modern NATO Military Mobility and Diversification Logistics Doctrine (Allied Joint Publication AJP-4.4)[5]. The location of the ORLEN industrial complex in Płock is a permanent and perfectly known satellite asset, meaning it already constitutes a target of the highest strategic priority for a potential adversary. Maintaining narrow, conflicting roads in its vicinity does not reduce the risk of reconnaissance or attack; it merely drastically paralyzes the state's defensive capabilities.

Modern warfare and the NATO Baseline Requirements for National Resilience[5] clearly define that the security of such a hub is built through infrastructure flexibility and redundancy, not by hiding it. The new crossing over the Vistula and the S60 route eliminate the critical Single Point of Failure (SPoF) through the geographic dispersion of logistical risk. The argument regarding a “cumulative target” completely collapses when confronted with the NATO Integrated Air and Missile Defence (IAMD) Doctrine[5]:

3.4. Route Alignment within the Gostynin-Włocławek Landscape Park
and the Natura 2000 Site

The construction of the proposed S60 route along the optimal, grade-separated alignment necessitates traversing a peripheral section of the Gostynin-Włocławek Landscape Park. Implementing this solution is entirely devoid of any real spatial alternatives. It is an absolute priority for ensuring the efficient evacuation of the population from the left bank (southern) and remaining districts of Płock, guaranteeing direct access to a high-capacity trunk road that channels vehicle flows out of the potential hazard area.

Simultaneously, this alignment dictates uncompromising military mobility, enabling – in sudden, crisis situations and under conditions of immediate hybrid threats – rapid and protected transport of armed forces from the left bank of the Vistula directly into the region of the strategic refining and petrochemical complex.

The implementation of the postulated transport investments in the Płock region will require traversing protected areas as well, necessitating special procedures under the Polish Act on the Provision of Information on the Environment and its Protection, Public Participation in Environmental Protection and Environmental Impact Assessments. The construction of the new bridge in Rydzyno, due to its location in the Vistula valley, directly affects a Natura 2000 site, which will require invoking the imperative reasons of overriding public interest (IROPI) procedure related to national security and defence, in accordance with Article 6(4) of the EU Habitats Directive[8]. Conversely, the alignment of the S60 Expressway through the periphery of the Gostynin-Włocławek Landscape Park (GWLP) will be executed based on the provisions of the national special-purpose road act (specustawa drogowa), which allows for the optimization of the transport corridor for an overriding public interest.

3.4.1. Strategy for Minimising the Ecological Footprint and Environmental Compensation in the GWLP Corridor

Awareness of the S60 route traversing a peripheral fragment of the Gostynin-Włocławek Landscape Park imposes an obligation on designers to apply above-standard biosphere protection measures. To prevent the proposed defence corridor from becoming a barrier to animal migration corridors, the technical design must be based on the green tunnel doctrine. Within the framework of the investment, the following are envisaged:

As part of environmental compensation (in accordance with Article 75 of the Environmental Protection Act)[4], it is postulated that the investor finance a restorative afforestation programme on lands adjacent to the park over an area three times larger than the terrain occupied by road construction, as well as modernise the tourist-educational infrastructure of the GWLP. Thanks to this, the realisation of the military and emergency objective will be integrated with enhancing the ecological resilience of the entire forest complex.


4. RAILWAY INFRASTRUCTURE: FREIGHT BYPASS
AND PASSENGER TRUNK HUB

4.1. Płock Freight Bypass and Rejection of the Suburban Variant

Meeting public safety requirements and SEVESO III regulations[3],[4] necessitates the immediate removal of heavy freight trains carrying dangerous substances (in accordance with regulations) from the city's densely populated residential zone to its outskirts.

The new railway layout of the agglomeration must be integrated into the national and international network by:

4.3. North–South Railway Strategic Axis

It is proposed to construct a second track and electrify the freight-passenger corridor with critical infrastructure status on the Zgierz – Płock – Laskowice Pomorskie section (Figure 3). This is a crucial dual-use project, guaranteeing secure fuel logistics for the country (ORLEN), meeting the ecological requirements of the EU Green Deal, and fulfilling NATO's military mobility objectives.

Within the framework of implementing this undertaking, the construction of a second track on the Kutno – Płock route (vicinity of the new junction in Trzepowo) is postulated as the absolute priority of the first stage, in parallel with the expansion of the Zgierz – Kutno section, which will allow for the immediate elimination of a critical logistical bottleneck and an exponential increase in freight capacity prior to the full implementation of the remaining axis elements. The second stage should encompass the Płock – Sierpc – Brodnica section, finalising the modernisation of Line 33, while the final stage will be the implementation of the postulated task along Line 208 on the Brodnica – Grudziądz – Laskowice Pomorskie section.

The postulated investment regarding the construction of a second track and the full electrification of Line 33 on the Kutno – Trzepowo section (terminating the second track construction in Trzepowo at the connection point of the postulated double-track link to Line 33, integrating this line with the Płock Freight Bypass) constitutes a crucial link of the proposed Railway Strategic Axis North–South on the Zgierz – Kutno – Płock – Grudziądz – Laskowice Pomorskie route. To fully exploit the logistical and throughput potential of this corridor, it is necessary to take coordinated actions at government level. These measures should lead to the inclusion of the complementary modernisation of further sections of the railway network in national investment plans: the remaining section of Line 33 north of Trzepowo station, Line 208 between Brodnica and Laskowice Pomorskie, and Line 16 on the Zgierz – Kutno route. This investment will allow for the adaptation of the technical parameters of the lines to the requirements of long-distance passenger traffic and heavy freight transport (cargo) generated by strategic industrial plants in Płock. It is emphasised that the planning and implementation of these long-distance infrastructure intentions rests with the national infrastructure manager (PKP PLK)[10], to whom this master plan directs a formal investment request.

North–South Railway Strategic Axis
Figure 3. North–South Railway Strategic Axis

5. TRANSVERSAL DEFENCE CORRIDOR S12/S60: NATIONAL LOGISTICAL INTEGRATION

A key factor drastically increasing the geopolitical and military significance of the S60 Expressway on the Kalisz junction (S11) – Turek – Koło junction (A2) – Lubień Kujawski junction vicinity (A1) – Gostynin – Płock – Glinojeck junction (S7) – Ciechanów – Ostrołęka – Łomża junction (S61) – Zambrów/Białystok junction (S8) route as one of the main pillars of the national network is its direct operational synergy with the postulated westward and south-westward extension of the S12 expressway (Figure 2). This postulate enjoys strong, unified support from local governments in this part of the country, aiming to break the transport marginalisation of the region. The S60 road, even in its autonomous variant, has a fully independent, parallel defensive character, serving as a crucial manoeuvre axis for Allied NATO forces. However, it is precisely the functional coupling of both these arteries, which converge at a strategic hub near Kalisz and Ostrów Wielkopolski, that creates a unified, grade-separated transversal corridor of the highest defence priority, multiplying operational-logistical capabilities across the entire axis of the alliance's eastern flank.

Connection of Polish Army and NATO Bases: The region of south-western Poland (Lower Silesia, Lubusz Land, Greater Poland) features the highest degree of saturation with strategic military units, training grounds, and logistics centres of the Polish Armed Forces and Allies (e.g., Żagań, Świętoszów). Connecting the proposed S12 with the S60 route opens up the shortest, uncompromised rapid deployment route for these formations towards the north-eastern borders of the country.

The Shortest and Segregated Route: The combined S12/S60 corridor enables the complete bypassing of the highly congested Łódź and Warsaw transport hubs. This guarantees the direct and rapid deployment of heavy military transports from the interior of the country to sensitive border regions: the border with the Kaliningrad region, the Polish–Belarusian border, the Suwałki Gap, and further towards the Baltic states.

Płock as a Strategic Fuel Depot on the Move: Within a transport axis constructed in this way, Płock becomes a crucial, central supply port for operating troops. Mass columns and logistical transports moving from the south-west can refuel and draw conventional and hydrogen fuels directly from the Płock refining and petrochemical complex in a grade-separated and secure manner (isolated from city centres), immediately continuing their march towards the theatre of military operations.


6. INVESTMENT PHASING STRATEGY
AND IMPLEMENTATION SCHEDULE

Taking into account the unprecedented scale of the integrated infrastructure package, implementing all facilities within a single time window is impossible from the standpoint of budgetary limits and construction market execution potential. To ensure financial and operational continuity, the investment must be divided into three autonomous, logically linked phases with diversified sources of financing:

Phase I: Critical Priority (Years 2027–2030) – Bottleneck Elimination

Phase II: Strategic Integration (Years 2030–2034) – Overcoming the Vistula Barrier and Connecting to the National Network

Phase III: Full Synergy and Decarbonisation (Years 2034–2037) – Multimodal Ring

The timely implementation of the indicated implementation phases is the foundation for achieving multi-level benefits, crucial both for the development of the Płock region and for the stability of the entire country.


7. FRAMEWORK CAPITAL EXPENDITURES (CAPEX)
AND STATE BUDGET REVENUES

The implementation of the full package of integrated transport infrastructure for Płock requires the commitment of significant public and sustained EU funds. The table below presents the estimated implementation costs for individual components (in baseline prices from 2026) along with the assigned financial instruments.

Infrastructure Pillar Key Components Estimated CapEx (PLN billion) Primary Financing Sources
National Road Pillar Construction of the S60 Expressway on the priority section: Koło junction (A2) – Lubień Kujawski junction vicinity (A1) – Gostynin – Płock – Glinojeck junction (S7) in a dual carriageway (2x2) standard along with a new dual carriageway (2x2) expressway bridge over the Vistula at the point of Rydzyno near Płock (military load class MLC 150 / STANAG). 6.0 – 7.5 Programme for National Road Construction (RPBDK)[2], National Road Fund (KFD)
Local Road Pillar Completion of the City Ring Road of class GP standard in a dual carriageway (2x2) format along with the construction of a new dual carriageway (2x2) road bridge in Maszewo compliant with military load class MLC 150 / STANAG for ADR transport; a dual-carriageway (2x2) internal city emergency-evacuation corridor on the east–west axis of class GP and G standard with the construction of a second twin-lane span of the Płockiego Czerwca 1976 r. Bridge across the Brzeźnica River; dual-carriageway (2x2) class GP access roads on the City Ring Road – S10 and S60 expressway junctions route; construction of single-carriageway logistics-transport roads around the ORLEN complex. 2.2 – 2.8 Fund for Road Development (RFRD), Płock municipal budget, targeted state budget subsidy (critical infrastructure protection)
Railway Freight Pillar Płock Freight Bypass (western variant) as a double-track and electrified main line, together with a new double-track and electrified freight-military bridge over the Vistula River in Maszewo; double-track and electrified links integrating the Płock Freight Bypass with Line 33; a dedicated, fully double-track link to the CMK North Line with bilateral, grade-separated switch junctions; and a single-track electrified link integrating Line 33 with the line to Przasnysz. 4.5 – 5.5 CEF Transport – Military Mobility (up to 50%)[8], Armed Forces Support Fund (Ministry of National Defence)[11], PKP PLK[10]
Railway Passenger Pillar Construction of a second track and electrification of Line 33 on the Kutno – Trzepowo section (scope of works: 115.5 tkm), combined with the construction of a new double-track and electrified alignment of the line on the Góry – Płock station section as a dedicated passenger-emergency route; construction of a double-track, electrified railway bridge over the Vistula in the vicinity of the Solidarności Bridge; implementation of the new Płock Radziwie station in a new location; launching the new Płock Góry station and implementing a grade-separated triangular junction on the border of Radziwie and Góry; launching the Płock agglomeration railway (orbital railway), operating in a closed-loop system. 3.2 – 4.0 Railway Programme (KPK)[2], FEnIKS Programme (EU), Regional Funds
Multimodal Hub A river-rail-road port with transshipment terminals and a storage zone on the Włocławek Reservoir; freight transshipment terminals; storage zone (excluding long-term liquid fuel storage installations). Technical details of the Hub are in section 2.4. 1.5 – 2.0 Partnership (PPP): ORLEN, PERN supported by EU subsidies (CEF/FEnIKS), PGW Wody Polskie budget, and PKP PLK
Estimated Total Sum Full Integrated Master Plan 17.4 – 21.8 Multi-level financial assembly (PL/EU/PPP)

Achieving Macroeconomic Efficiency (ROI Indicator for the State Treasury)

The total implementation cost of all four pillars spread over a 10-year period (years 2027–2037) generates an average annual burden on the state budget and targeted funds at a level of approximately PLN 1.8 – 2.2 billion.

This amount represents a mere fraction of the annual revenues to the state budget generated directly by the Płock industry. The ORLEN Group contributes tens of billions of zlotys each year to the State Treasury in taxes (CIT, VAT, excise duty, fuel tax and emission tax). In this respect, investing in the full transport layout of Płock is not a cost, but a low-cost insurance policy (under 5% of the annual tax stream generated by the Płock hub), guaranteeing the operational continuity of the country's primary taxpayer.

Conclusions from the Cost–Benefit Analysis (CBA)

The framework capital expenditures (CapEx) presented in this chapter at a level of PLN 17.4 – 21.8 billion demonstrate full macroeconomic profitability for the state budget.

In accordance with the detailed arguments presented in sections 2.1, 2.3, and 2.5, this expenditure constitutes de facto a low-cost insurance policy protecting the operational continuity of the country's feedstock heartland.

The entirety of the outlays balances out with interest relative to potential losses from an SPoF-type distribution paralysis and provides a unique opportunity to secure external EU and defence co-financing, as demonstrated in the financing structure of individual pillars.


8. IMPLEMENTATION RISK MATRIX
AND MANAGEMENT STRATEGY

Identifying risks at the conceptual stage allows for the preventive implementation of legal and engineering procedures, preventing delays in implementation.


9. SYNTHESIS OF CAPACITY AND TRAFFIC FLOWS
ACROSS STRATEGIC VISTULA CORRIDORS

9.1. Structural Inadequacy and Functional Asymmetry of Level Crossings

The current distribution of Annual Average Daily Traffic (AADT) in the Płock hub reveals a critical asymmetry in terms of burdens and functions. In its current state, the Solidarności Bridge safeguards the road freight corridor, accommodating the predominant volume of heavy goods vehicle traffic and the transport of hazardous substances (ADR). This capability stems from its technical specifications and the strategic routing of traffic away from densely developed areas. However, this model exhausts its efficiency within the target framework.

Conversely, the Legionów Józefa Piłsudskiego Bridge remains severely overloaded with passenger, agglomeration, and public transport flows, while performing the critical function of the sole right-bank crossing for railway freight traffic. The necessity to route heavy freight sets and dangerous substances (RID) across the structure of an old, single-track bridge and adjacent residential neighbourhoods drastically lowers civil security levels. In a strategic sense, this means that the city and regional transport system lacks flexibility – any blockade of one of these crossings immediately paralyses the entire city structure, cutting off the country's strategic production base in both road and rail dimensions.

9.2. Depletion of Daily Capacity in Evacuation Corridors

Traffic measurements show that the historical transport corridor based on the Legionów Józefa Piłsudskiego Bridge regularly reaches critical saturation during peak transport hours, approaching theoretical daily capacity limits. From the standpoint of civil security (crisis management in SEVESO III zones)[12], constant congestion in this area generates unacceptable risks. The existing geometric layout of access roads prevents efficient vehicle distribution, which, in the event of an urgent need to evacuate the population from the right-bank, industrial part of Płock, will lead to an immediate paralysis of emergency corridors.

An analogous state of critical capacity depletion and traffic flow saturation is recorded in the railway corridor based on the same century-old bridge structure. The accumulation of RID freight flows from the refinery and passenger traffic towards Kutno on a single, obsolete, single-track facility creates a structural logistical gridlock. In the event of a hybrid threat materialising or a technical failure occurring, the lack of an alternative rail crossing prevents the railway from being used as a secure, high-capacity evacuation backbone for the civilian population.

9.3. Projected Transport Network Paralysis and Induced Traffic

Current road traffic volumes on national roads DK60 and DK62 in the Płock region show a steady upward trend. Within the strategic horizon to 2037, in light of the launch of the Port Polska mega-hub in Baranów[7], a drastic accumulation of freight flows along the Warsaw – Łódź axis is projected. Leaving Płock without a direct connection to the external network of high-speed routes will cause an influx of international flows of heavy vehicles directly onto the city's internal arteries, generating a permanent logistical gridlock and preventing the timely distribution of fuels and green hydrogen within the country's defence structure.

In parallel, a surging increase in capacity demand will impact railway routes. The introduction of the new CMK North main line and the planned line to Przasnysz will trigger the phenomenon of induced railway traffic. Failure to segregate feedstock logistics flows from newly created, high-speed passenger corridors will lead to the complete operational inadequacy of the Płock hub. Under crisis conditions, this will prevent the smooth operation of passenger trains and drastically lengthen response times for NATO military transports (the military mobility doctrine).

9.4. Conclusions and Recommendations for the Infrastructure Master Plan

Necessity to Construct New Diversification Corridors: Traffic flow analysis results unconditionally justify rejecting the concept of routinely modernising the existing road and track network. The only strategic solution that eliminates the single point of failure (SPoF) phenomenon is the construction of new, independent crossings over the Vistula:

Physical Separation of Transport Flows and Protection of Evacuation Corridors: Implementing full, three-level isolation of road traffic is recommended. A key action is relocating international and main national flows of ADR logistics and heavy freight to Płock's external bypass within the S60 Expressway (via the proposed bridge in Rydzyno). Meanwhile, a portion of intra-regional and industrial transport will be directed to the western city bypass, which comprises a dual carriageway access road on the section from the junction with the S10 route in Proboszczewice to the western areas of the ORLEN industrial complex, followed by the City Ring Road on the section from the corporation's production plant to the road bridge over the Vistula in the Maszewo region and onward to the left bank of the Vistula. Almost all of the transport traffic flows mentioned, moving between the refining and petrochemical complex and high-speed roads, will be carried out via dedicated logistics-transport corridors for dangerous goods (ADR) and non-standard cargo. Applying the presented solutions will allow for relieving the internal street network and the Solidarności Bridge for local economic distribution needs, and will guarantee absolute patency and security for the city's emergency-evacuation corridors in crisis situations.

Elimination of RID Threats and Implementation of the Railway Ring: In the railway component, the absolute priority of the master plan is the complete removal of the transit of dangerous goods (RID) from residential zones through the construction of the western variant of the Płock Freight Bypass. Relocating passenger traffic to a new, double-track and electrified Line 33 alignment, along with a new crossing in the vicinity of the Solidarności Bridge, will allow for the definitive dismantling of the obsolete and conflicting track section from the Legionów Józefa Piłsudskiego Bridge. Both mass flows of heavy freight trains from the ORLEN production plant and passenger trains operating on the north–south axis from CMK North absolutely require increased capacity through the implementation of the proposed second track on Line 33 on the Kutno – Trzepowo section. Ultimately, this geometry will enable the completion of a full railway ring around the agglomeration, allowing for the launch of an ecological agglomeration railway, which under crisis conditions will serve as an independent, grade-separated magistral evacuation corridor.


SUMMARY

The radical modernisation and expansion of Płock's transport system is a prerequisite for maintaining Poland's fuel and energy security. The new Railway Freight Bypass, the passenger bridge over the Vistula, the City Ring Road, and the proposed S60 Expressway constitute integrated, mutually reinforcing pillars of a modern logistics network. The aforementioned infrastructural needs are relatively low in relation to the volume of GDP that the Płock industrial centre has generated for decades, currently generates, and will generate in the future.

These investments represent a financial and logistical security policy for the country. The entirety of the assumptions exhibits full compatibility with the EU doctrine of dual-use facilities. This guarantees the absolute eligibility of the project to secure targeted EU funds from the CEF Transport – Military Mobility programme[8], as well as from the national defence budget[11], which currently exceeds the level of 4.8% of GDP. Poland's most important energy, fuel and hydrogen hub must cease to be a transport island.

In conclusion, the integrated implementation of all postulated infrastructural projects – fully justified by Płock's strategic geographical location in the geometric centre of the country and over the crucial Vistula corridor – constitutes an indispensable foundation for resolving the region's critical logistical problems. Although implementing this concept involves serious budgetary outlays, in the final macroeconomic calculation it generates powerful, unprecedented added value. These investments permanently safeguard the operational continuity of the country's energy hub, reconfigure the transport map of central Poland, and elevate the strategic resilience of NATO's eastern flank to the highest level of continental security.


BASELINE MATERIALS AND DATA SOURCES

This Master Plan and the attached conceptual drawings have been developed based on an independent analysis, as well as publicly available, official strategic documents, legislative acts, defense doctrines, development plans, and topographic basemaps from the following institutions and organizations:


Geospatial Reference Note (GIS Metadata):

All conceptual cartographic layouts (Figures 1, 2, and 3)
are referenced to the WGS 84 (EPSG:4326) geographic coordinate system.

The central reference point of the Płock agglomeration hub (Figure 1)
is located at 52.5514° N, 19.7084° E (Google Maps).

Sylwester Fiet  |  Płock, Poland  |  2026